1
Vote

SsrsRenderStudio Server failing over REXs

description

The existing ConfigurationManager.NextReportServerSetting() logic needs to be changed. Currently if the SsrsRenderStudio Server's preferred REX is somewhere in the middle of REXs to try then the '/following-sibling::*' selection will never try the REXs before the preferred REX. The logic needs to wrap back around to try all possible REXs.

comments